If you bit-the-bullet and ordered yourself a new 2007-2018 Jeep Wrangler JK and endured the wait we hope you are enjoying your JK. Below is a list of DCX order codes, these codes indicate the various stages of the build.

Get personalized content recommendations and answers drawn from our website. Simply type your question or topic of interest, and our AI assistant will help you find relevant articles, tips, and insights. You can also have a natural conversation to explore topics in more depth.

If you were one of the many of us Jeepers that ordered a new JK, especially in the early days you my recall the excess wait that was encountered. Some waited 4 to 6 months for their new Jeep to arrive and get in to their hands. We definitely experienced this with the jeepfan.com 2007 Rubicon when it took 4 months to arrive.
I
Unscheduled: | BX – good order available for scheduling BB – fleet order only – review by bid department BD – special equipment processing BE – edit error – coding error which must be corrected before order can be scheduled BG – order has passes edit but cannot be scheduled regardless of sold status |
Reason Codes: | F – finance hold – automatic cancellation after 15 days B – model or option build outL – material restrictionM – material hold (fleet)ZA – canceled order |
Scheduled: | C – tentative schedule D – firm schedule: serial number assigned, approx time in station – 5 days D1 – gateline: unit sequenced for production, est ship date assigned, Approx time in station – 12 days |
Build: | E – framing F – paint |
Built: | I – unit built, pending final inspection J – vehicle passed final inspection but not released to carrier JB – shipped to body vendor JE – shipped to emissions JJ – consigned to body vendor JS – shipped to storage KZ – released by plant and invoiced |
Traffic Codes: | KZ L – released but not shipped KZ M – first rail departure KZ N – first rail arrival KZ O – delayed/received KZ OA – plant hold, quality audit KZ OB – zone, dealer, sales, vehicle prep, tax, diversion or derailment hold, dealer refusal, vehicle diverted KZ OC – carrier delay, strike-bound, emission or safety hold, rail car shortage, bad or insufficient load, inclement weather, need shipping order, manifest error KZ OD – mechanical failure, glass damage, vehicle in repair, lacking parts or storage hold KZ OE – misdropped or misshipped vehicle KZ OF – shipped air freight, stolen vehicle recovered, show vehicle, test info code, vessel sailed KZ OG – damaged vehicle, stolen vehicle, abandon to carrier, vehicle scrapped, donate vehicle, repair and auction KZ OH – all other “O” type carrier codes KZ T – second rail departure KZ U – second rail arrival KZ X – delivered to dealer KZ Y1 – major damage – must not be sold as new KZ Y2 – major damage – vehicle sold at auction |